Guy Chiarulli General Contractor

Guy Chiarulli General Contractor

igotaguyforthat.construction

In order to remove the review, please report on the original platform as well!
Darren Podolak
Darren Podolak
2021.12.11
Guy remodeled our master bathroom 2.5 years ago and the shower floor tile started coming up this fall. The thinset he used in the shower floor did not grab the tile, and the tiles separated from the waterproofing membrane because the drain pitch was not correct. Waiting for Guy to stand by his work.

Email notifier

Reason

Comment